Project scenario
A licensed Texas abatement firm wins a short-term scope on floor tile and mastic removal in an older commercial building.
Dust challenge
Friable potential during mastic scrape, fibers disturbed during tile lift.
Site constraint
Two-week project length, full containment with anteroom, all waste double-bagged.
Why a HEPA vacuum was selected
Owning a Protector for two weeks didn't pencil. A rental met the timeline.
Suggested vacuum setup
Dirt Eater Protector inside containment, spare H14 filters, decon shower at anteroom exit.
Practical workflow
Vacuum operated inside containment, exterior wipe-down before exit, bag-change inside containment, equipment decon documented.