Project scenario
A Houston demolition contractor strips out a multi-floor office tower for full renovation.
Dust challenge
Drywall, insulation, fine ceiling dust, and potential lead paint on older finishes.
Site constraint
Adjacent floors remain occupied during strip-out. Tenant complaints would escalate to property management.
Why a HEPA vacuum was selected
Big Boss with continuous-bag handling moves volume; HEPA filtration prevents recirculation into adjacent floors.
Suggested vacuum setup
Dirt Eater Big Boss as primary, Dirt Eater Jr for tenant-corridor finishing, negative-air machines in parallel.
Practical workflow
Vacuum continuously during demo, daily corridor wipe-down, lead testing before any sanding or scraping of older paint.
This is a typical project scenario used to illustrate how HireAVac equipment is deployed. Not a guarantee of results or compliance.